Keltbray, an Esher, England-based demolition contractor, recently posted a video detailing how the company methodically engineered a way to remove a bridge at the Ferrybridge “C” Power Station in West Yorkshire, England. The bridge needed to be removed as part of the company’s comprehensive demolition work at the site.
The company conducted a comparative risk assessment to determine the safest way to demolish the bridge before formulating a strategy to deploy a crane on a reinforced concrete pad to lift the structure, which would later be sheared on-site.
Watch the video below, courtesy of Sky Captain Aerial Imaging:
Latest from Construction & Demolition Recycling
- Martin Marietta, Quikrete Holdings exchange aggregates assets
- Lakeshore Recycling Systems, MCS Recycling achieve RCI certification
- Iron Woman Logistics Services awarded grant to build Colorado C&D recycling facility
- Collective Waste Solutions acquires Alcop Resource Recycling transfer station
- Construction hiring remains slow in January
- Sybilion seeks to help manufacturers confidently address volatility
- Construction backlog rebounds in February
- USTR to study additional steel, aluminum tariffs