Prior to any demolition, utility disconnects were conducted, asbestos containing materials were abated and permits were obtained.
The project consisted of the demolition of four wood frame residential structures that were an average of two stories in height. Associated garages, shed, patios and decks were also demolished. In addition, all sidewalks, driveways, fencing and landscaping was removed. An in-ground pool was also demolished.
Concrete from the pool and foundations was crushed onsite using Dallas Contracting’s mobile crushing planted and used as backfill.
More information is available at www.dallascontracting.com.
Latest from Construction & Demolition Recycling
- Waste Pro files brief supporting pause of FMCSA CDL eligibility rule
- Des Moines project utilizes recycled wind turbine blades
- Vecoplan to present modular solutions at IFAT 2026
- Terex Ecotec appoints Bradley Equipment as Texas distributor
- Greenwave raises revenue but loses money in Q2 2025
- Recycled steel prices hold steady
- John Deere launches ‘Building America’ excavator contest
- Triumvirate Environmental acquires Environmental Waste Minimization