Controlled Demolition Inc. (CDI), Phoenix, Maryland, performed the preparation for, and explosives felling of, three 350-foot-tall reinforced concrete chimneys at the now-closed Brayton Point Power Station in Somerset, Massachusetts, March 24.
CDI acted as the explosive subcontractor to Brayton Point LLC, St. Louis, Missouri, who is serving as the main demolition contractor on the project.
The successful implosion sets the stage for the planned demolition of the plant’s cooling towers April 27.
Watch the video of the chimney implosion below, courtesy of CDI:
Latest from Construction & Demolition Recycling
- Sun Equipment launches used construction equipment division serving Houston
- Harbor Logistics adds business development executive
- Terex Ecotec announces Blue Machinery as distributor
- SA Recycling completes FPT facilities purchase
- Alamo Group acquires loading equipment maker
- Develon to spotlight compact equipment at ConExpo
- Construction job openings remain low in October
- Sysdyne acquires Slabstack, expanding construction materials reach